{"id":12876,"date":"2021-12-16T12:58:14","date_gmt":"2021-12-16T12:58:14","guid":{"rendered":"https:\/\/voice.org.rs\/?p=12876"},"modified":"2021-12-16T12:58:14","modified_gmt":"2021-12-16T12:58:14","slug":"vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use","status":"publish","type":"post","link":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/","title":{"rendered":"Vodovod i kanalizacija: NEPI Requested Excess Water Release While the Facility Was in Use!"},"content":{"rendered":"<p><strong>Apart from the request to extend the permit for pumping excess underground water in the sewage system during the construction works on the Promenada Shopping Centre, submitted by the contractor P.A.B. Company, \u201cVodovod i kanalizacija\u201d PUC also rejected a request from the investor NEPI Rockcastle to continue pumping excess water even after the end of the construction works, i.e. while the facility was already in use.<\/strong><\/p>\n<p>This has been confirmed by the chief engineer at \u201cVodovod i kanalizacija\u201d Ikonija Karadzic in her statement to VOICE. She said that the investor had requested in February of last year to be allowed to continuously release 60 litres of underground water into the sewage system of Novi Sad for an indefinite period of time during the exploitation of the facility.<\/p>\n<p>\u201cWe replied with a negative answer and explained that we could give them the permit we issued during the construction works and that once the works were over, we were no longer under the obligation to allow it. Draining of excess underground water is not among our core activities, nor can we accept that responsibility, since it is simply impossible. Nowhere in the world is underground water released constantly into a sewage system,\u201c says Ikonija Karadzic.<\/p>\n<p>When it comes to the permit to release underground water, she explained that such permit was issued to contractors only during construction works, until the foundations are protected and hydro-insulation is installed. That did not affect the system, she added, because it did not last a long time.<\/p>\n<p>\u201cIt is a common procedure for all construction sites in the city, because that\u2019s what Novi Sad is like. The whole city is above underground water and very often, almost every large and important facility has a problem,\u201d she explained and added that the permit was normally renewed after two or three months, but in case of Promenada it had been renewed for a period of over one year.<\/p>\n<p><strong>\u201cVodovod i kanalizacija\u201d PUC: \u201cThe construction of the facility probably did not see the problem of foundation hydro-insulation solved\u201d<\/strong><\/p>\n<p>When asked why the investor had requested for the underground water to be released into the sewage system beyond the end of the envisaged construction works, Ikonija Karadzic replied that it was a problem the investor and contractor should make public, because they had probably failed to solve the problem of the foundation hydro-insulation during the construction works.<\/p>\n<p>Professor at the Faculty of Civil Engineering in Subotica Petar Santrac, who was hired by the SBR Soletanche Bachy from Romania, the company in charge of project design, to conduct an assessment of the influence off permanent pumping of excess underground water into the sewage system onto the facilities in the vicinity of Promenada, said in his statement to VOICE that the investor had opted for a system that had been designed to drain water during the entire period of its exploitation.<\/p>\n<p>\u201cThey did not envisage a basin, which would allow the water level to raise, but they simply installed a thin layer of road surface, down on the second level and they envisaged the water should be constantly drained and pumped out for as long as the facility is in use,\u201d says Santrac and adds that the problem was that the contractors had nowhere to pump that water into, because the idea was to constantly pump it into the sewage system of Novi Sad or directly into the Danube river.<\/p>\n<p>\u201cIf they don\u2019t drain that water constantly, the level of water within the facility will level with the level of underground water, which means the whole first or second level coul be flooded. The level of underground water is close to three meters and they had gone up to eight meters in depth, which means that there is a water column of five meters, which will flood the underground levels if the water is not removed somewhere,\u201d says Santrac.<\/p>\n<p>The question is, he adds, whether the sewage system has a sufficient capacity to hold all that water. According to him, it is up to \u201cVodovod i kanalizacija\u201d to say it is impossible and then some other solution should be sought. For example, when a summer storm hits the city and it gets flooded, that could be a problem.<\/p>\n<p>\u201cIf \u201cVodovod i kanalizacija\u201d provided a negative answer, they\u2019ll have to install a separate drain pipe from the site to the Danube river. This 800-meter pipe will have to be installed, which is an additional, but necessary expenditure, because there is no other solution,\u201d claims professor Santrac, emphasizing it is now too late to think about hydro-insulation.<\/p>\n<p>Namely, the League of Social Democrats of Vojvodina, \u201cGradjanska Vojvodina\u201d coalition of NGOs and the opposition parties in Novi Sad issued announcements in which they appeal to the competent bodies in Novi Sad and the investors in the Promenada Shopping Centre to solve the problem related to underground water as soon as possible, since it is threatening to endanger the normal daily lives of the citizens. According to their claims, pumping large quantities of underground water into the sewage system could jeopardize its normal functioning, water supply, as well as the buildings in the Liman residential area and its vicinity.<\/p>\n<p>After that, the mayor of Novi Sad Milos Vucevic announced a \u201cfor-cause\u201d inspection of the Promenada construction site, saying that \u201cno-one is in danger, nor would the city ever do or allow something like that.\u201d However, we have still not received any results of the announced inspection.<\/p>\n<p>At the end of last week, Vucevic talked to the Radio-Televison of Vojvodina and said that a building inspection team visited the site and \u201cestablished that the works were progressing in accordance with the construction permit.\u201d He added that \u201cPromenada will not be issued a use permit until all the works have been completed.\u201d<\/p>\n<p><strong>Mladen Savatovi\u0107 (VOICE)<\/strong><\/p>\n<p><a href=\"http:\/\/voice.flywheelstaging.com\/wp-content\/uploads\/2019\/06\/voice-logo-2019-beli.jpg\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-4057 size-medium\" src=\"http:\/\/voice.flywheelstaging.com\/wp-content\/uploads\/2019\/06\/voice-logo-2019-beli-300x79.jpg\" alt=\"\" width=\"300\" height=\"79\" srcset=\"https:\/\/voice.org.rs\/wp-content\/uploads\/2019\/06\/voice-logo-2019-beli-300x79.jpg 300w, https:\/\/voice.org.rs\/wp-content\/uploads\/2019\/06\/voice-logo-2019-beli-768x202.jpg 768w, https:\/\/voice.org.rs\/wp-content\/uploads\/2019\/06\/voice-logo-2019-beli-850x224.jpg 850w, https:\/\/voice.org.rs\/wp-content\/uploads\/2019\/06\/voice-logo-2019-beli-400x105.jpg 400w, https:\/\/voice.org.rs\/wp-content\/uploads\/2019\/06\/voice-logo-2019-beli.jpg 1000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Apart from the request to extend the permit for pumping excess underground water in the sewage system during the construction works on the Promenada Shopping Centre, submitted by the contractor P.A.B. Company, \u201cVodovod i kanalizacija\u201d PUC also rejected a request from the investor NEPI Rockcastle to continue pumping excess water even after the end of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11048,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1496],"tags":[],"class_list":["post-12876","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-english-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Vodovod i kanalizacija: NEPI Requested Excess Water Release While the Facility Was in Use! - Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vodovod i kanalizacija: NEPI Requested Excess Water Release While the Facility Was in Use! - Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;\" \/>\n<meta property=\"og:description\" content=\"Apart from the request to extend the permit for pumping excess underground water in the sewage system during the construction works on the Promenada Shopping Centre, submitted by the contractor P.A.B. Company, \u201cVodovod i kanalizacija\u201d PUC also rejected a request from the investor NEPI Rockcastle to continue pumping excess water even after the end of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/\" \/>\n<meta property=\"og:site_name\" content=\"Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-16T12:58:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/voice.org.rs\/wp-content\/uploads\/2018\/09\/Promenada-foto-VOICE-Mladen-Savatovic-4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1412\" \/>\n\t<meta property=\"og:image:height\" content=\"686\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"VOICE\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"VOICE\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/\",\"url\":\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/\",\"name\":\"Vodovod i kanalizacija: NEPI Requested Excess Water Release While the Facility Was in Use! - Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;\",\"isPartOf\":{\"@id\":\"https:\/\/voice.org.rs\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/voice.org.rs\/wp-content\/uploads\/2018\/09\/Promenada-foto-VOICE-Mladen-Savatovic-4.jpg\",\"datePublished\":\"2021-12-16T12:58:14+00:00\",\"author\":{\"@id\":\"https:\/\/voice.org.rs\/en\/#\/schema\/person\/5a2b4514b0b8e80109f15e2c883b683c\"},\"breadcrumb\":{\"@id\":\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#primaryimage\",\"url\":\"https:\/\/voice.org.rs\/wp-content\/uploads\/2018\/09\/Promenada-foto-VOICE-Mladen-Savatovic-4.jpg\",\"contentUrl\":\"https:\/\/voice.org.rs\/wp-content\/uploads\/2018\/09\/Promenada-foto-VOICE-Mladen-Savatovic-4.jpg\",\"width\":1412,\"height\":686},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/voice.org.rs\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Vodovod i kanalizacija: NEPI Requested Excess Water Release While the Facility Was in Use!\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/voice.org.rs\/en\/#website\",\"url\":\"https:\/\/voice.org.rs\/en\/\",\"name\":\"Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;\",\"description\":\"Nezavisnog dru\u0161tva novinara Vojvodine\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/voice.org.rs\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/voice.org.rs\/en\/#\/schema\/person\/5a2b4514b0b8e80109f15e2c883b683c\",\"name\":\"VOICE\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/voice.org.rs\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/bcdfc04ee30bc5aba48e3b9d6130f77684fb3825f4dae7c6a06bbf6192b85d3a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/bcdfc04ee30bc5aba48e3b9d6130f77684fb3825f4dae7c6a06bbf6192b85d3a?s=96&d=mm&r=g\",\"caption\":\"VOICE\"},\"url\":\"https:\/\/voice.org.rs\/en\/author\/cenzura\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Vodovod i kanalizacija: NEPI Requested Excess Water Release While the Facility Was in Use! - Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/","og_locale":"en_US","og_type":"article","og_title":"Vodovod i kanalizacija: NEPI Requested Excess Water Release While the Facility Was in Use! - Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;","og_description":"Apart from the request to extend the permit for pumping excess underground water in the sewage system during the construction works on the Promenada Shopping Centre, submitted by the contractor P.A.B. Company, \u201cVodovod i kanalizacija\u201d PUC also rejected a request from the investor NEPI Rockcastle to continue pumping excess water even after the end of [&hellip;]","og_url":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/","og_site_name":"Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;","article_published_time":"2021-12-16T12:58:14+00:00","og_image":[{"width":1412,"height":686,"url":"https:\/\/voice.org.rs\/wp-content\/uploads\/2018\/09\/Promenada-foto-VOICE-Mladen-Savatovic-4.jpg","type":"image\/jpeg"}],"author":"VOICE","twitter_card":"summary_large_image","twitter_misc":{"Written by":"VOICE","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/","url":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/","name":"Vodovod i kanalizacija: NEPI Requested Excess Water Release While the Facility Was in Use! - Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;","isPartOf":{"@id":"https:\/\/voice.org.rs\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#primaryimage"},"image":{"@id":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#primaryimage"},"thumbnailUrl":"https:\/\/voice.org.rs\/wp-content\/uploads\/2018\/09\/Promenada-foto-VOICE-Mladen-Savatovic-4.jpg","datePublished":"2021-12-16T12:58:14+00:00","author":{"@id":"https:\/\/voice.org.rs\/en\/#\/schema\/person\/5a2b4514b0b8e80109f15e2c883b683c"},"breadcrumb":{"@id":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#primaryimage","url":"https:\/\/voice.org.rs\/wp-content\/uploads\/2018\/09\/Promenada-foto-VOICE-Mladen-Savatovic-4.jpg","contentUrl":"https:\/\/voice.org.rs\/wp-content\/uploads\/2018\/09\/Promenada-foto-VOICE-Mladen-Savatovic-4.jpg","width":1412,"height":686},{"@type":"BreadcrumbList","@id":"https:\/\/voice.org.rs\/en\/vodovod-i-kanalizacija-nepi-requested-excess-water-release-while-the-facility-was-in-use\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/voice.org.rs\/en\/"},{"@type":"ListItem","position":2,"name":"Vodovod i kanalizacija: NEPI Requested Excess Water Release While the Facility Was in Use!"}]},{"@type":"WebSite","@id":"https:\/\/voice.org.rs\/en\/#website","url":"https:\/\/voice.org.rs\/en\/","name":"Vojvo\u0111anski istra\u017eiva\u010dko-analiti\u010dki centar &quot;VOICE&quot;","description":"Nezavisnog dru\u0161tva novinara Vojvodine","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/voice.org.rs\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/voice.org.rs\/en\/#\/schema\/person\/5a2b4514b0b8e80109f15e2c883b683c","name":"VOICE","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/voice.org.rs\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/bcdfc04ee30bc5aba48e3b9d6130f77684fb3825f4dae7c6a06bbf6192b85d3a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/bcdfc04ee30bc5aba48e3b9d6130f77684fb3825f4dae7c6a06bbf6192b85d3a?s=96&d=mm&r=g","caption":"VOICE"},"url":"https:\/\/voice.org.rs\/en\/author\/cenzura\/"}]}},"_links":{"self":[{"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/posts\/12876","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/comments?post=12876"}],"version-history":[{"count":2,"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/posts\/12876\/revisions"}],"predecessor-version":[{"id":12878,"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/posts\/12876\/revisions\/12878"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/media\/11048"}],"wp:attachment":[{"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/media?parent=12876"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/categories?post=12876"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/voice.org.rs\/en\/wp-json\/wp\/v2\/tags?post=12876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}